Ask HN: Have we confused efficiency with "100% utilization"?
18 points
7 hours ago
| 7 comments
| HN
I recently had a conversation with an engineer who optimized assembly lines at Black & Decker in 1981 using an Apple II.

He described how they measured atomic hand movements (reach, grasp, orient) in decimal seconds to balance the line. But he made a distinction that stuck with me:

Back then, the goal was Flow (smoothness), which inherently required some slack in the system. Today, he argued, the goal of modern management is Utilization (removing every micro-second of downtime).

His quote: "We deleted the 'waiting,' but we forgot that the waiting was the only time the human got to breathe."

I feel like I see this exact pattern in Software Engineering now. We treat Developer Idle Time as a defect to be eliminated by JIRA tickets, rather than the necessary slack required for thinking.

Ask HN: For those who have been in the industry for 20+ years, do you agree?

altairprime
2 hours ago
[-]
Yes. Resilience is an unexploited opportunity for short-term gains, and in the U.S. anyways it’s not legal for most corporations to prioritize their long-term health over the short-term gains demanded by most shareholders (thus the private equity industry).
reply
nialse
5 hours ago
[-]
The trade off between utilization and latency is rarely understood in organizations. Little’s law should be mandatory (management) reading. Unused capacity is not waste, but buffers that absorb variability, and thus keeps latency down.
reply
nickevante
5 hours ago
[-]
This is the exact mental model I was looking for.

It reminds me of Kingman's Formula in queueing theory: As server utilization approaches 100%, the wait time approaches infinity.

We intuitively understand this for servers (you never run a CPU at 99% if you want responsiveness), yet for some reason, we decided that a human brain—which is infinitely more complex—should run at 99% capacity and still be expected to handle urgent interruptions without crashing.

reply
repelsteeltje
7 hours ago
[-]
Yes, it's sad.

For a couple of years I helped develop scheduling software for supply chains in process industry. We frequently optimized for throughput or resource utilization, but also for just in time or minimal latency. So goals differ, but it kind of works in industrial context.

Now, there has always been a tendency to also frame knowledge work like software development as though it's just industrial production. Hence (mostly futile) attempts to make things predictable, reproducible and "efficient". Where efficiency is bluntly taken to mean optimal utilization.

reply
shoo
4 hours ago
[-]
There's often a tension between efficiency (say maximising throughput, or minimising latency) and robustness (being able to cope with shortages of inputs, demand shocks, work around failures). The world got to experience a bunch of logistical examples of this around COVID-19, but there's examples everywhere. Having a whole 2nd engine on a passenger plane seems wasteful, until the first engine fails.

When attempting to apply a process optimisation perspective from supply chains or manufacturing to software delivery, one way the software delivery problem space differs is that the software delivery process isn't a process that produces a stream of identical units that are independent of each other.

Suppose we abstract the software situation, we can tell ourselves that it is a repeatable process that produces an endless stream of independent features or fixes (weighed in "story points" say) that get shipped to production. This mental model maybe works some of the time, until it doesn't.

In reality, each software change is often making a bespoke, one-off modification or addition to an existing system. Work to deliver different features or fixes are not fungible and delivering the work items may not be independent -- if changes interfere with each other by touching overlapping components in the existing system and modifying them in incompatible ways. A more realistic mental model needs to acknowledge that there's a system there, and its existing architecture and accumulated cruft may heavily constrain what can be done, and that the system is often a one-off thing that is getting changed in bespoke ways with each item of work that ships.

reply
nickevante
5 hours ago
[-]
That distinction between Industrial Production and Knowledge Work feels like the root cause.

It seems like modern Agile has mutated into a tool for Manufacturing Predictability rather than Software Discovery. We are so obsessed with making the velocity graph look like a straight line that we stopped asking if we are even building the right thing.

Do you think that shift happened because non-technical management needed a metric they could understand (tickets closed), or did we do this to ourselves?

reply
svilen_dobrev
5 hours ago
[-]
there's a lot written on the topic - e.g. [1]

My ELIengineer take is that no bearing works without some slack - it gets stuck. But that still needs some understanding, and that is less and less available, esp. at management levels.

[1] https://fs.blog/slack/

reply
aristofun
2 hours ago
[-]
What are you talking about?

Up to 80% of a typical dev time these days (depending on the company and the project) is idle waiting for a build to fail again, deployment to finish, all teammates showing up to another useless meeting, writing stupid performance reviews, arguing about secondary yet unavoidable issues on slack and pr comments, etc etc.

reply
weare138
5 hours ago
[-]
Genx here. Yes that is accurate.
reply
malux85
6 hours ago
[-]
Yes, and it’s now up to us as managers to engineer that ebb and flow as part of the process. Don’t assign too much work all the time. Make sure that the employees feel excited and rewarded for their hard work (don’t just dump another pile on their desk). Make sure their work is diverse enough so they are not stuck doing the same slog all the time. Make sure the employee sees the big picture of the company - this is how your work is contributing to our mission (the janitor at nasa isn’t sweeping the floor, he’s helping put a man on the moon). When boring work must be done tell them you know it’s boring but all of us have to shovel gravel sometimes, it’s just part of life, but there’s a bit of fun on the other side of it. Be interested in the employees - what are their personal goals over the next 12 months? Learn their dogs name, learn their hobbies, be interested in them as a human and then TRY HELP THEM get to their personal goals. If they want to get fit then block out an hour gym time and send them off to it. Encourage them to bring you new ideas, support them to try out the new ideas - if it doesn’t work out then “hey no problem” but if it does work out tell everyone in the company very publicly and make a lot of noise about it. Don’t criticise them in public, take them aside and help them be better. And lastly, is someone isn’t working out, or is causing cultural problems - get rid of them, it’s harming more than you think. Don’t micromanage - assign the work, support them and then get the hell out of the way.

Good managers will do all of this simultaneously.

Bad managers just try to cram as much work in as possible. Because they are so poor at evaluating the quality of what their employees are doing, the only thing they understand is maximise throughput at the expense of all else. If your manager is like this, leave asap